Project: Veterans
Project Type
Engineering for failed 12’ vertical concrete retaining wall, coordinated with Geotech for soil borings and slope stability analysis, review of existing drawings, advised on constructability and best procedure, obtained bids from contractors to perform work.
Previous
Next